• Home
  • >
  • News
  • >
  • Industry News
  • >
  • The ferronickel arrived at the factory, and the production of the Jiangsu stainless steel factory was resumed!

The ferronickel arrived at the factory, and the production of the Jiangsu stainless steel factory was resumed!

On March 23, 2022, it was reported that since ferronickel finally arrived at the factory, the AOD furnace, which had been shut down due to raw materials, was about to start production in Jiangsu Stainless Steel Plant. The embarrassment of the shortage of materials and the shutdown of production has been well relieved.

But on the other hand, the submerged arc furnace, which has been restricted for many days, is still difficult to start production due to lack of materials. According to the news, the main reason is that due to the epidemic control at the port of destination, the nickel ore is still unable to be released.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy